Skip to content
D. Svilenković
01Work02Services03Industries04Guides053D06Check your site07Contact

HomeWorkGreen Plus

Green Plus

Green Plus sells a technical solution whose value first has to be explained. The site leads from the electricity bill, through measurement and design, to specific equipment, financing and sending the data for an assessment.

  • Multi-page website
  • Belgrade
  • September 2026
  • 2 min read
  • PHP 8.5
  • JSON-LD
  • GSAP
  • Protected form
Customer
Green Plus d.o.o.
Industry
Electricity savings — reactive power compensation, LED lighting
Location
New Belgrade
Type
Technical business website
Technologies
PHP 8.5 · JSON-LD · GSAP · Lenis
Website
greenplus.rs
Status
Live site, on the official domain
Home page of the Green plus website with the heading Reactive power compensation
Home page — “Reactive power compensation”, a thousand cabinets built and the Send your bill for analysis button

01 / 05

From the electricity bill to the solution

The home page starts from the line item the customer sees on the bill: excess reactive energy consumption, which is billed at double the price and does not run a single machine. Three numbers sum it up — the 0.95 power factor below which it is charged, excess reactive energy at twice the price, and a payback period of 6 to 36 months — along with the fact that a thousand cabinets have been built.

The call to action is clear: Send your bill for analysis, or call the number at the top.

The EPCOS / TDK compensation equipment section with equipment groups
Equipment — EPCOS/TDK capacitors, controllers and contactors by group, with photos

02 / 05

Equipment and medium voltage

The offer is built on EPCOS/TDK equipment: capacitors, power factor controllers, contactors, thyristor modules, reactors, custom cabinets, measuring instruments and active filters, with links to the manufacturer's pages. A separate section covers medium-voltage compensation at 6, 10 and 20 kV.

The type of solution is explained through four kinds: fixed, automatic, detuned and dynamic (thyristor-switched), and a separate paragraph is addressed to those who already have a capacitor bank but see the charge back on their bill.

The Payback section with a payback period of 6 to 36 months
Payback — a payback period of 6 to 36 months and approximate investment by type of compensation

03 / 05

How it works, payback and ESCO

The process has four steps: you send the bill, on-site measurement, calculation and quote, then installation and a check on the next bill. The payback section explains the payback period and budget prices per kVAr for each type of compensation.

Anyone who does not want to tie up money has the ESCO model: Green Plus finances and installs the equipment, and repayment comes out of the savings achieved on the bill. Alongside compensation, LED lighting for industrial facilities is also offered.

04 / 05

Proof and documentation

Two catalogs are available for download as PDFs: TDK's compensation equipment catalog and the EPCOS catalog of medium-voltage capacitors. A section called Our Work shows installed systems with photos, from 80 kVAr at low voltage to 3×1000 kVAr at 6 kV, and the References section provides an excerpt from the reference list as of December 31, 2024.

05 / 05

A form that collects enough information

The contact form takes company details and an attachment with the electricity bill (PDF, JPG or PNG). That way the first conversation starts with the information needed for an assessment, not a general question about price.

On a phone

The same site, in your hand.

Most visitors come from phones, so the layout, buttons and images are arranged for the small screen first.

Green Plus on a phone

Questions

What clients ask.

Does the site show only services?

No. Besides services, it shows technical equipment, catalogs, references, the measurement process and financing models.

Can an inquiry include an electricity bill?

Yes. The protected form accepts PDF, JPG and PNG attachments up to a size limit.

Related projects

From the same field.

Next projectKanjon UvacMulti-page website · Družinići, Sjenica

→Contact

Have a project? Write to us.

Four short questions, about a minute of your time. We reply within 24 hours.